About UsServicesProjectsWhy Winans?ResourcesCareersContact Us
Winans Construction
  Projects
 
BATHROOM REMODEL
Piedmont, CA
Page 1 | 2 | 3 | 4 | 5 | 6 | 7
 

Bathroom Remodel Piedmeont before
Before

Bathroom remodel Piedmont, after
After

This Piedmont master bath/dressing area was a rabbit warren of small and functionally out dated spaces. It was poorly lit, had just one sink and minimal in-bath storage. The closet-like shower stall was removed to allow for a double vanity. The trim tile at the top of the tile wainscoat is carried around each mirror. Wall sconces light the vanity area while recessed ceiling cans are used for general lighting.

SFBA NARI First Place Winner
Designed by David Gast, AIA